Water Works 2004 Ltd

Bank Side Apartments

When the existing boiler system at Bank Side Apartments failed they called in Water Works to replace all the pipe work and Fixtures in the boiler Room, Water Works installed new Hot Water Tanks and Gas Water Heaters

banks-side

Two new 1000 liter Water Tanks install, with a flow and return pump to supply hot water from the gas water heaters

banks-side2

Two Gas Water Heaters, heating the water inside the storage tanks.